|
Post by nokturnal on Apr 18, 2020 1:34:43 GMT 1
My 2 stroke parts are either taking a long time to get here or shops that I require work from are closed. Time to put the back burner project on the lift. I have this thing to get together... Idea is to run a bare bones, minimal electronics, muscle bike that handles... as well as it can with period parts. Specs so far (many on the shelf) -88 750 frame and swing arm -90 750 forks -total loss -dyna coils -high capacity oil cooler -head cooler -fox shock -1100 wheels -1109 high compression wiseco kit -RS38 flatslides -akrapovic full race system Long way to go...
|
|
|
Post by nokturnal on Apr 18, 2020 1:35:14 GMT 1
|
|
|
Post by donkeychomp on Apr 18, 2020 23:14:47 GMT 1
Do it. DO IT!
Alex
|
|
|
Post by nokturnal on Apr 19, 2020 3:35:36 GMT 1
trying to wrap my head around the total loss wiring today. going to build a loom up myself... luck will be needed.
|
|