|
Post by 2banger on Jul 21, 2019 23:26:46 GMT 1
Starting building 2008 Hybrid engine subframe cradle; 2 stock tie bars forward mount as oem plus the 2strokeshop tie bars, rear mounts . Engine 29l cases bored and stroked +10mil rdz race crank, Oem banshee jugs resleaved 68mm bogg cool head Dellorto 39mm vhsb with banshee Airbox and unifilter. 175/180 main 55 pilot needle position 2 Electric's fitted nos 350 f2 loom with all ypvs auxiliaries, bdk cdi Fuelcel 5 gallon tank , pingle twin outlet Sebimoto carbon panels Oem new rear shock , stock forks maxton gp cartridge kit. Brembo calipers with braking brembo discs
Been mine go to ride this year
Over winter might swap oil tank to underseat position ,then relocate battery in tail unit.
|
|
|
Post by markhoopy on Jul 22, 2019 15:44:48 GMT 1
|
|
Mad Biker
Drag-strip hero
We lead others try and follow.
Posts: 243
|
Post by Mad Biker on Jul 23, 2019 11:16:51 GMT 1
Looks great!
|
|
|
Post by akhil2212 on Sept 10, 2019 7:09:53 GMT 1
Hi,
Can you share source of hybrid frame ?
I am looking to build the same with RS250 MK1 frame & YPVS engine.
Thanks a lot.
Akhilesh
|
|
|
Post by 2banger on Sept 11, 2019 17:37:00 GMT 1
You want ready to go kit contact Jim fastfromthepast usa
|
|
|
Post by 2banger on Sept 12, 2019 15:12:31 GMT 1
Hi, Can you share source of hybrid frame ? I am looking to build the same with RS250 MK1 frame & YPVS engine. Thanks a lot. Akhilesh [/quote]
|
|
|
Post by 2banger on Oct 10, 2019 22:14:37 GMT 1
Bikes for sale on eBay
|
|